extra long night safety lead - 5M
$4000 CAD
Take your fast and energetic dog for long walks with this sturdy, reflective longĀ leash,Ā that gives you good control over your pup, while allowing them plenty of space to run and explore!
sizes:Ā ļ»æboth measure 3 meters long
- medium (1.5 cm width)
- large (2 cm width)
features:
- 100% polyester
- signature "puppia" logo
- hand-made in Korea